Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 7 results ...
Aliakbarlou, S, Wilkinson, S and Costello, S B (2017) Exploring construction client values and qualities: Are these two distinct concepts in construction studies?. Built Environment Project and Asset Management, 7(03), 234-52.
De Silva, N, Weerasinghe, R P N P, Madhusanka, H W N and Kumaraswamy, M (2017) Relationally integrated value networks for total facilities management. Built Environment Project and Asset Management, 7(03), 313-29.
Kamara, J M (2017) Maintaining focus on clients’ requirements using the DQI tool: Towards a requirements-oriented project process. Built Environment Project and Asset Management, 7(03), 271-83.
Kumaraswamy, M, Mahesh, G, Mahalingam, A, Loganathan, S and Kalidindi, S N (2017) Developing a clients’ charter and construction project KPIs to direct and drive industry improvements. Built Environment Project and Asset Management, 7(03), 253-70.
Pärn, E A and Edwards, D (2017) Vision and advocacy of optoelectronic technology developments in the AECO sector. Built Environment Project and Asset Management, 7(03), 330-48.
- Type: Journal Article
- Keywords: building information modelling,digital built environment,laser scanning,machine vision,optoelectronic devices,point cloud
- ISBN/ISSN:
- URL: https://doi.org/10.1108/BEPAM-11-2016-0081
- Abstract:
A review of laser scanning devices and applications within the architecture, engineering, construction and owner-operated sector reveals that the costly and labour-intensive attributes of scanning devices have stimulated the development of hybrid automated and intelligent technologies to improve performance.
Schultz, A L (2017) Integrating lean and visual management in facilities management using design science and action research. Built Environment Project and Asset Management, 7(03), 300-12.
Weerasinghe, R P N P and Sandanayake, Y G (2017) Collaborative facilities management model: Sri Lankan perspective. Built Environment Project and Asset Management, 7(03), 284-99.